The new construction home inspection in Stansbury UT has some similarities to the home inspection of an existing home, but there are also differences. It is similar to a home inspection in that it includes all major structural components such as plumbing, electrical, heating, air conditioning, roofing, siding, foundations, windows, and appliances. The inspection of a newly built house is usually done in phases, according to a set schedule and with multiple inspections. This approach allows for a full inspection of a house in construction without obstructions such as walls, foundations, or appliances. An inspection can be performed after each major construction phase to ensure that each step has been completed correctly.

Do you need to have a house inspected if it is newly constructed?

Consider it. There have been reports that up to 100 people could be involved in construction, including your builder and their subcontractors. Making mistakes is part of being human. Many things can go wrong in construction and can be costly or take a long time to fix.

  • Improper grading, poor drainage
  • Wiring or plumbing that is incorrect
  • Roofs or siding that is poorly constructed
  • Correct ventilation
  • Poorly routed ducts
  • There’s much more

The county building inspectors have a lot of work to do and they’re only looking out for the minimum standards. They aren’t working on your behalf like an independent inspector, so you won’t see everything that a home inspector would. A home inspection is worth it because any defects that are found can be corrected right away, not after you have moved in.

What is the new home inspection schedule for construction?

Diamond Perfection Home and Property Inspections follows a standard schedule that includes 3 or 4 phases.

  1. Pre-Pour Foundation: This phase ensures that the foundation is properly graded and drained, especially if it’s in a floodplain. It also checks for proper spacing for utility lines coming through the foundation.
  2. Pre-Drywall: This phase can be combined with Phase #3. It checks framing, electrical wiring, AV wiring and roofing.
  3. Pre-Insulation: This phase is used to check for air leaks throughout the house. These can lead to HVAC systems running inefficiently, and certain areas of the home being uncomfortable.
  4. Pre-Final walk-through with your contractor : This phase is similar to a traditional inspection of a home. It includes checking the quality of sheetrock, the appliances, the lights, the HVAC system, and the mechanical components.
See also  HOW TO PAINT GIB BOARD? A QUICK GUIDE

You should hire an independent home inspection even if your builder is highly rated. “I check the AC system’s calibration on final walk-through inspections. I check the electrical panel for correct breaker installation. Jonathan Dooley says he looks for things like GFCI and AFCI receptacles and adequate handrails on stairways, as well as proper ventilation and insulation of attic space. Diamond Perfection Home and Property Inspections has an IRC-certified building inspector. If you are in the area, and looking for new construction home reviews near me, book an inspection now!

 

Unveiling The Beauty: Hamsa Temporary Tattoos